Recent content by smarties

  1. S

    Wall Ties

    Is it possible to go overboard with wall ties....already spent £30 and only four courses up on a smallish build?
  2. S

    Returning blockwork DPC question

    well, budget is limited, vertical DPC it is am afraid. It's on 7/8 quid a roll. do you know if I should lap it back between door/window frame and blockwork on reveal?
  3. S

    self build b@*£s up

    I asked in as many ways as possible because I am not qualified or a professional and I wanted to get as much assistance as possible since I am keen to help my Father.....
  4. S

    self build b@*£s up

    Thanks Nige F....I see you've been thanked 13 times on this site so far. I am not a brickie, or a builder, just helping my father at his home with his shed so he can keep his things safe. Thanks anyway hope you treat everything you do with the same level of professionality.
  5. S

    Returning blockwork DPC question

    When using 4inch blocks to return a wall over cavity around windows or doorframes should I use 6inch or 9" DPC? Where should the DPC lap back? i.e. should it lap back on both sides for example back into the door frame?
  6. S

    Builders vs. Brickies (Bonding)

    Where the foundation wall in question is almost completly (bar 150mm on external side) reinforced by solid mass i.e. floor slab and compacted subbase on inside and pavement slab (metre wide roughly) and subbase and retaining wall on outside....... where will my troubles likely occur? Will it be...
  7. S

    Irregular Bond Please Help (Diagram Included)

    Please can someone help with this from a structural perspective, my foundation walls and external/internal above ground walls have matching perps in many places (two inexperienced blocklayers = one problem) //www.diynot.com/network/smarties/albums/ The diagram above is in my images in...
  8. Untitled

    Untitled

  9. smarties

    smarties

  10. S

    self build b*&@s up.....please help

    Project Garage/shed - 4inch cavity walls, with ties. Friend works - foundations dug, 1st blocks laid with ties etc, subbase compacted, base poured(4 inches) to groundfloor height. I get to work...DPM overlapped by DPC - above ground blockwork started - PROBLEM.... now at window height...
  11. S

    self build b@*£s up

    my friend has made a mess already of his self build 2 car garage. He has laid the 4 inch floor slab within his 2 block high, cavity walls, ties, all subbase compacted below accordingly, footings dug out and laid etc. He built these walls according to what type of bond I am not sure. There were...
  12. S

    Builders vs. Brickies (Bonding)

    Builders vs. Brickies.....Theoretically, I have heard it argued today that there is no real need to consider having a continuous blockwork bond above and below DPC? Since a house virtually 'sits on itself' on top of DPC (it could effectively slide off in one go. but unlikely). I would ask for...
Back
Top