I am having a loft conversion done at the moment, I had wanted to install a level access shower tray either wedi or impey foam core, but the builder says there is a steel joist in that corner running full length along the wall and he says a standard tray would be better however ther would be a lip, but can the tray former be laid on top of the steel instead of timber batons as usual..