Hi, thanks for the replys.
The floor is a concrete slab. The inner blockwork is level with the slab level at the moment.
So the best thing is to remove a course of the inner blockwork, visqueen, then fill in the whole cavity upto the outer brickwork.
Hope my answer is clear.