Search results

  1. N

    Nominal Voltage

    Nominal voltage (U) what is it 230 or 240v? (Uo) what is it 230 or 240v?
  2. N

    Shop/Flat CU palcements

    should the Flat Cu be in the flat and accessible though??? Its in shops at minute
  3. N

    Shop/Flat CU palcements

    Should a shop which has a flat above have both CUs in the shop fed from 1 main fuse, but with two meters and two boards? I think that it would be against regs as what if needed to isolate circuit when shop was closed? What if mcb tripped out how could turn back on? Opinions appreciated!
  4. N

    No CPC

    If a dwelling does not have CPCs on lighting circuits, installed before 1966, can the circuits be extended to add more lights or does earths have to be added to the circuits?
  5. N

    MWC

    This may sound daft, but when changing fluoro lamps is it required to fill in a MWC?
  6. N

    Main Earth

    Been to a house today which seems to be supplied with 16mm earth from next door! It has no clamp for TN-S or no PME supply. Would it cost for supply company to supply an earth or is it a case of putting a clamp on the lead sheath of supply cable, which indicates to me it was a TN-S at some time...
  7. N

    NICEIC EIC

    so just leave blank then???
  8. N

    NICEIC EIC

    would this just be used if new meter tails were installed maybe?
  9. N

    NICEIC EIC

    Dosn't say out like that, just "record details of distribution circuit at origin (meter tails) on 1st line. Then has thick lines around the 1st line. No link to it i'm affraid just whats in front of me!
  10. N

    NICEIC EIC

    At top of tests page it asks for details of distrubution circuit (Meter tails) but what boxes can be filled in for them apart from description, wiring method, conductor size and IR? Do yopu just leave rest blank?
  11. N

    NICEIC EIC

    Is that what you do? Do you fill these in for NICEIC? Do you think the forms are a little over the top?
  12. N

    NICEIC EIC

    But it dosn't have one, this is the only CU, most domestic only have 1 cu, so do you just enter 1 or summit like that?
  13. N

    NICEIC EIC

    page3
  14. N

    CU Problem

    Are the plastic fronts in the busbar normally easy to remove to see if there's any object bridging between the two phases?
  15. N

    NICEIC EIC

    Domestic EIC
  16. N

    CU Problem

    Will an Ir test between phases with MCBs/RCBOs off tell if fault between phases on basbar? If there is is it a case of replacing or is it easy to open up and repair/remove foriegn object?
  17. N

    NICEIC EIC

    On Niceic EIC it says designation of consumer unit, what is written in there? Its the 1st time i'm filling one in thats all
  18. N

    CU Problem

    Why u ask yellow n red?
  19. N

    CU Problem

    Its a merlin gerin. it had stands of copper from 10mm cable between screw on busbar and mcb so used the same when swapped for rcbo, do you reckon one of the strands may of fell and arched across phases? It was between red and yellow, why did you ask?
  20. N

    Consumer Unit

    Sounds very expensive to me Where do you live?
Back
Top