Hi,
I am moving an underground drainage run that supports only waste from my building.
There is a part where I am going to have to go round the corner of my house with a 90, either side of this 90 will be about 4 metres. Instead of putting a chamber for access could I T off vertically for rodding points?
Lastly is there a correct way to block up a run that won't be used anymore or would concrete be fine at both ends?
Thanks in advance
I am moving an underground drainage run that supports only waste from my building.
There is a part where I am going to have to go round the corner of my house with a 90, either side of this 90 will be about 4 metres. Instead of putting a chamber for access could I T off vertically for rodding points?
Lastly is there a correct way to block up a run that won't be used anymore or would concrete be fine at both ends?
Thanks in advance