Hi there.
We just bought a 4 bed detached which was built in 1985. My builder who is a fair chap after a visit suggested I need a full rewire because the system is old, the fuse box is old, not up to the recent regulation etc. He quoted £4.5k for a job that would run for 1-1.5 month. Now I’d like to validate his statement, please see the pictures attached. I opened one light switch and one two-gang power socket. I see there is the ground wire present. Also, I’d like to install electric underfloor heating in a few rooms, add more sockets in the kitchen and near the flat screen etc. Would like to hear people opinion on this.
Many thanks.
We just bought a 4 bed detached which was built in 1985. My builder who is a fair chap after a visit suggested I need a full rewire because the system is old, the fuse box is old, not up to the recent regulation etc. He quoted £4.5k for a job that would run for 1-1.5 month. Now I’d like to validate his statement, please see the pictures attached. I opened one light switch and one two-gang power socket. I see there is the ground wire present. Also, I’d like to install electric underfloor heating in a few rooms, add more sockets in the kitchen and near the flat screen etc. Would like to hear people opinion on this.
Many thanks.