3 bedroom kit House Plumbing/Heating install

Joined
14 Aug 2007
Messages
119
Reaction score
0
Country
United Kingdom
I've just purchased some ground with planning permission to stick up a 3 bedroom kit.

The answer to this could be "how log is a piece of string" but here goes,

Duration for plumbing and heating works, would 150 man hours likely cover all bases here IE.

1 x Central Heating install (9 Rads with Combi)
1 x Bathroom (nothing flash)
1 x Kitchen (plumbing to sink and supply for hob)

Basically everything required from ground up including drainage and water main, from roughing through to finishing including all commissioning works.

Thanks in advance
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top