I've just purchased some ground with planning permission to stick up a 3 bedroom kit.
The answer to this could be "how log is a piece of string" but here goes,
Duration for plumbing and heating works, would 150 man hours likely cover all bases here IE.
1 x Central Heating install (9 Rads with Combi)
1 x Bathroom (nothing flash)
1 x Kitchen (plumbing to sink and supply for hob)
Basically everything required from ground up including drainage and water main, from roughing through to finishing including all commissioning works.
Thanks in advance
The answer to this could be "how log is a piece of string" but here goes,
Duration for plumbing and heating works, would 150 man hours likely cover all bases here IE.
1 x Central Heating install (9 Rads with Combi)
1 x Bathroom (nothing flash)
1 x Kitchen (plumbing to sink and supply for hob)
Basically everything required from ground up including drainage and water main, from roughing through to finishing including all commissioning works.
Thanks in advance