Hi everyone.
Looking for advice. I'm having an extension built on our kitchen at present, in the new layout our existing 32mm mdpe incoming pipe and stopcock will be in the middle of the floor, not ideal lol.
I want to simply isolate at the meter outside then cut and join the mdpe and ruin a new 32mm pipe to the new sink location. The pipe run was going to be via the new floor slab in the extension. Should I run the pipe in the celotex insulation then just pop up through the screed at the sink?
Looking for advice. I'm having an extension built on our kitchen at present, in the new layout our existing 32mm mdpe incoming pipe and stopcock will be in the middle of the floor, not ideal lol.
I want to simply isolate at the meter outside then cut and join the mdpe and ruin a new 32mm pipe to the new sink location. The pipe run was going to be via the new floor slab in the extension. Should I run the pipe in the celotex insulation then just pop up through the screed at the sink?