I had 50mm of liquid screen poured last friday morning.... so it has been down approx just over 4 days.
Semi basement - one third of basement is above ground - and it has 3 small windows. Temp down there at the moment is about 10 degrees.
I popped my head in earlier and I can still see some areas that appear to still look damp.
Would a halogen heater and a fan speed up the drying time? I was planning to start with framing out my metal stud over the weekend. Floor channels will be glued to the floor.
Semi basement - one third of basement is above ground - and it has 3 small windows. Temp down there at the moment is about 10 degrees.
I popped my head in earlier and I can still see some areas that appear to still look damp.
Would a halogen heater and a fan speed up the drying time? I was planning to start with framing out my metal stud over the weekend. Floor channels will be glued to the floor.