Although I have posted this in the plumbing forum, perhaps here is also appropriate.
I am adding an en-suite adjacent to an existing bathroom. The soil stack is in the bedroom which will have the ensuite. To gain space I would like to use a class A1 AAV to remove the upper stack. The stack will have the 2 bathrooms and a downstairs cloakroom into it. One other property feeds into the inspection chamber outside.
Is this satisfactory regs wise?
If not, I would be grateful for helpful suggestions.
Read more: https://www.diynot.com/diy/threads/a1-aav.551776/#ixzz6WW69QNGZ
I am adding an en-suite adjacent to an existing bathroom. The soil stack is in the bedroom which will have the ensuite. To gain space I would like to use a class A1 AAV to remove the upper stack. The stack will have the 2 bathrooms and a downstairs cloakroom into it. One other property feeds into the inspection chamber outside.
Is this satisfactory regs wise?
If not, I would be grateful for helpful suggestions.
Read more: https://www.diynot.com/diy/threads/a1-aav.551776/#ixzz6WW69QNGZ