Hi
i want to add 1 rad and move one on my heating system it has 6 at the moment
can i use the pipe work from the one i remove to run two rads .was looking at using these pipes under the floor boards to go back to 22mm pipe run and then run the rad i remove and add one as well
thanx
i want to add 1 rad and move one on my heating system it has 6 at the moment
can i use the pipe work from the one i remove to run two rads .was looking at using these pipes under the floor boards to go back to 22mm pipe run and then run the rad i remove and add one as well
thanx