adding new section to toilet stack

  • Thread starter Thread starter marsaday
  • Start date Start date
M

marsaday

I am adding a new T to the stack and the soil pipe which comes into this is 3m long. What fall do i need to use here?

Do i need to add any release valves ? Not sure if this run is too long. The height of my stack is about 9m (3 levels)
 
Slope should be One in Forty, so about 3 inches ;)
Don't go (much) steeper, or the solids get left behind. :shock:
You could use a bend with an access plate on it, otherwise no probs as it's only 3m..
 
ok thanks. So that would be a fall of 75mm. I have now read 60mm will be fine. is this to shallow then ?
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top