- Joined
- 17 Feb 2006
- Messages
- 373
- Reaction score
- 1
- Country
Draining the CH. Don't really know how to add inhibitor, but when everything is connected up again the very highest point will be the top of a towel rail. Which will have a bleed valve in it. If I just take off the whole bleed valve bit I've got a hole, facing upwards, I can slot a funnel into to add X100. Will that work? Or is there a better place to add it.
Cheers, Mike
Cheers, Mike