Alpha24R boiler +Honeywell Y plan.
I have had problems with CH OK but no hot water. After much investigation (including replacing the cylinder stat - unnecessary) I seem to have found that the fault is the programmer.
With both heat and HT calling, the programmer is live on both HW-on and HW-off wires from the programmer. It seems obvious that this is wrong but as the wiring and control system is so complex would some kind and knowledgable person confirm that these two wires should not be live at the same time.
I am assuming that HW-off should be live when the cylinder stat is satisfied (water hot) and HW-on should be live when the stat is calling (water cold).
I may now have to track down the Alpha 2 channel programmer or wire in an external programmer - any advice on this?
I have had problems with CH OK but no hot water. After much investigation (including replacing the cylinder stat - unnecessary) I seem to have found that the fault is the programmer.
With both heat and HT calling, the programmer is live on both HW-on and HW-off wires from the programmer. It seems obvious that this is wrong but as the wiring and control system is so complex would some kind and knowledgable person confirm that these two wires should not be live at the same time.
I am assuming that HW-off should be live when the cylinder stat is satisfied (water hot) and HW-on should be live when the stat is calling (water cold).
I may now have to track down the Alpha 2 channel programmer or wire in an external programmer - any advice on this?