Hi All,
Thanks in advance for your time...any input would be appreciated,
Our house currently has an Independent C30 Combi feeding 8 radiators (4 down, 4 up) – concrete base so all off downstairs fed by droppers.
Feed and return from/to Boiler is 22mm is via two “manifolds” upstairs that have microbore to/from each radiator individually.
System works fine – circulation / balance is good and radiators get up to temperature quickly enough.
We are currently have a complete re decorate together with the addition of a conservatory which will have a radiator fitted and needs a supply from (probably) one of the downstairs feeds.
I have been, or am considering replacing all the radiators, still original early/mid 80's installation with something more modern and efficient (bathroom with towel rail thingie) so am also considering replacing the microbore with 15mm at the same time. New radiator sizes may be different so some pipe work may be needed anyway. Biggish job but thought process is if we are going to do it then now is the best option whilst we have a relatively empty house.
Would anybody foresee any potential issues in replacing the current individual microbore feeds with perhaps a slight extension to the 22mm feed/return and then 15mm throughout ? Any problem with the boiler being OK for such a setup ?
If I stuck with the microbore would it compatible with new generation radiators or not have enough throughput for them to be efficient ?
Any input / thoughts appreciated.
Thanks,
Freddy
Thanks in advance for your time...any input would be appreciated,
Our house currently has an Independent C30 Combi feeding 8 radiators (4 down, 4 up) – concrete base so all off downstairs fed by droppers.
Feed and return from/to Boiler is 22mm is via two “manifolds” upstairs that have microbore to/from each radiator individually.
System works fine – circulation / balance is good and radiators get up to temperature quickly enough.
We are currently have a complete re decorate together with the addition of a conservatory which will have a radiator fitted and needs a supply from (probably) one of the downstairs feeds.
I have been, or am considering replacing all the radiators, still original early/mid 80's installation with something more modern and efficient (bathroom with towel rail thingie) so am also considering replacing the microbore with 15mm at the same time. New radiator sizes may be different so some pipe work may be needed anyway. Biggish job but thought process is if we are going to do it then now is the best option whilst we have a relatively empty house.
Would anybody foresee any potential issues in replacing the current individual microbore feeds with perhaps a slight extension to the 22mm feed/return and then 15mm throughout ? Any problem with the boiler being OK for such a setup ?
If I stuck with the microbore would it compatible with new generation radiators or not have enough throughput for them to be efficient ?
Any input / thoughts appreciated.
Thanks,
Freddy