Hi, I am an experienced DIY'er and have successfully completed various projects around my home.
I'm changing a radiator and pipe work in the kitchen.
Sometime in the past the current radiator has been moved.
The problem is that whilst doing this the original microbore cooper pipes were extended along the skirting board and do do look neat.
I'm planning to run the new pipework under the flooring and I have 15mm and joints available from my past projects.
My question is if I connect the old microbore to 15mm under the flooring and then run it to the new radiator, will this have any negative effects on the system that outside normal balancing adjustments
My current system is 22mm core pipes and 15mm to upstairs radiators and micro bore to the downstairs radiators.
I'm changing a radiator and pipe work in the kitchen.
Sometime in the past the current radiator has been moved.
The problem is that whilst doing this the original microbore cooper pipes were extended along the skirting board and do do look neat.
I'm planning to run the new pipework under the flooring and I have 15mm and joints available from my past projects.
My question is if I connect the old microbore to 15mm under the flooring and then run it to the new radiator, will this have any negative effects on the system that outside normal balancing adjustments
My current system is 22mm core pipes and 15mm to upstairs radiators and micro bore to the downstairs radiators.