I have 600mm deep drainage trench to which the outside edge is exactly the line for the new fence.
As the ground it pretty much all dug up I can either backfill then later dig the post holes (400mm) to fill with concrete and away we go....
or.......
use some 200mm moisture resistant cardboard tubes, placed at level before back filling, then the holes are ready for the post and concrete.
What to you think?
As anyone used 160mm plastic drain pipe filled with concrete?