N
nrgizerbunny
pretty much as the subject really. as my previous thread, i want to extend the ring main. Local spark wants to replace the original 2gang socket with 2 single gang sockets (right next to each other) and then extend the ring main in between them.
I asked him if he could do it with a terminal block in behind the socket and he said "nah mate, its impossible to do that". I was just trying to see if he was trying to pull a fast one or not as he wanted £450 for the work which i thought was excessive, considering i have installed the new enclosures and conduit for him.
I asked him if he could do it with a terminal block in behind the socket and he said "nah mate, its impossible to do that". I was just trying to see if he was trying to pull a fast one or not as he wanted £450 for the work which i thought was excessive, considering i have installed the new enclosures and conduit for him.