Hi all,

We've recently had a survey and estimate from a basement tanking company for a type C drainage system. However, they have only quoted for the works they themselves do - and say we have to arrange quotes for the other works (digging/building sump hole, electrics, etc).

We are looking at other companies and getting individual quotes, but if anyone can help even with very ballpark costs for the below, it would be much appreciated. I know it's likely not as simple as just listing some bulletpoints, but even a rough guide/range would be great.

The room size is approx 3.3 x 3.3 metres.

Building works (pre-works)
- Removing epoxy resin floor laid on top of a concrete floor (concrete floor to remain)
- Break a drainage channel in the floor perimeter
- Excavate hole in concrete floor and build concrete box within it for sump chamber
- Excavate core hole for necessary discharge pipework (no idea what this actually means)

Building works (post works)
- Lay screed on floor over top of membrane the tanking will put down
- Line walls with a metal floor to ceiling studwork system, plasterboard and skim. Any insulation within the void
must be rigid board
- Jetting ports in drainage channel must remain accessible

Electrical work
- Your electrician to provide two separately supplied radial circuits, each controlling a 13 amp switched fused
spur with neon indicator for connection of sump pumps. MCB to be ‘C type’ to allow for initial start-up surge.
- The fuse box is in the basement already, which hopefully helps?

Any help or guidance appreciated!
 
Last edited:
£6-10K is my guess!

Presumably - Excavate core hole for necessary discharge pipework (no idea what this actually means) means your builder needs to provide a means (or route) for the sump pump pipe to be able to reach and drain into the mains sewer somewhere, we have no idea on the forum how convoluted (or not) that route might entail.
 
I need gutters repairing, to do this will need scaffolding, but it will be the builder who will arrange for it to be put up and down, and exactly where it's needed.

I would say find someone who can do the whole job. I have seen it too many times, when something goes wrong, they all point finger as someone else.
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top