Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Looking for a smarter way to manage your heating this winter? We’ve been testing the new Aqara Radiator Thermostat W600 to see how quiet, accurate and easy it is to use around the home. Click here read our review.
If there's no urgency then give it a couple of weeks. There are tower blocks that have fallen down where the builders have removed formwork and supports too soon.
I don't think there's too much difference with modern cement. I concreted a patch this year, I could rub the surface off with my boot a few days later.
If there's no urgency then give it a couple of weeks. There are tower blocks that have fallen down where the builders have removed formwork and supports too soon.
I don't think there's too much difference with modern cement. I concreted a patch this year, I could rub the surface off with my boot a few days later.
Modern cements are finer ground than in times of yore. This means that in a given volume of concrete there are a greater number of particles of cement which are therefore closer together. The setting process is the growth of dendrites (finger like structures) which interlock binding the mass together so the smaller gaps mean that the dendrrites interlock sooner.
We had a major fright in the late 70s when we tested a load of cubes at 7 days from our first major pour. It was a 60odd metre heavily reinforced pour and the concrete was to be 40N.
Average strength 27N measured. No worries: this is 2/3 of 28 day so we're looking at 3/2 x 27 so over 40. Come 28 days they only test at about 37N so the 7 day was about 75% and this was the norm for the whole job.
Modern cements are finer ground than in times of yore. This means that in a given volume of concrete there are a greater number of particles of cement which are therefore closer together. The setting process is the growth of dendrites (finger like structures) which interlock binding the mass together so the smaller gaps mean that the dendrrites interlock sooner.
The hydration process needs about 20% of the weight of cement any water above this makes the mix more fluid but has to go somewhere. Some of it will rise to the surface dragging cement particles with it leaving a soft dust surface (bleeding) and some will just form water pockets weakening the finished product.
Workability - yes. As said, too much water encourages 'dusting', when it lies on the surface. Unless you are building the Hoover dam, don't worry too much about strength, as long as you mix the product well and are no weaker than 6:1.
If you need to find a tradesperson to get your job done, please try our local search below,
or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Please select a service and enter a location to continue...
Are you a trade or supplier? You can create your listing free at DIYnot Local