The job entails:-
Remove old bathroom suite.
Remove old wall & floor tiles and re-board (if necessary)
Repair possibly required under the floor due to leaking shower (unknown cost)
Install new pipe work and waste systems.(toilet waste already inplace)
Re-tile.
Install new bathroom suite.
I will be supplying the new tiles and the new bathroom suite (inc separate shower).
The chap has quoted me £1750.........is this correct for 5 days work?
Thanks
Can some professional bathroom installer confirm the costs, as I'm being told that I am getting ripped off.....
The job entails:-
Remove old bathroom suite.
Remove old wall & floor tiles and re-board (if necessary)
Repair possibly required under the floor due to leaking shower (unknown cost)
Install new pipe work and waste systems.(toilet waste already inplace)
Re-tile.
Install new bathroom suite.
I will be supplying the new tiles and the new bathroom suite (inc separate shower).
The chap has quoted me £1750.........is this correct for 5 days work?
Thanks