Hi, This my plan of works for my bathroom refurb. I will be getting someone else in to do the electrical and plumbing work.
Just want to see if I have ordered what needs to get done correctly
Thanks
Prep Block up small window
Prep Install Shut off valves for bathroom water supply
1 Gut bathroom
• Bath, Toilet & Sink
• Shower unit
• Radiator & Brackets
• Tiles
• Skirting
• Smooth down ceiling
• Febond Blue-Grit on ceiling
2
Wiring for Mirror
Install Light Switch
Wiring for Towel Radiator
Wiring UFH Thermostat
Replace Copper piping with Plastic pipes & chase into walls
3
Install new floorboards
Install 6mm Warmup boards
Skim ceiling
Plaster
4
Tank wet areas
SBR Primer on Walls
Lay down UFH
Level floor
5
Fit Bath (1st Seal)
Tile Wall
Tile Floor
6
Plumb Bath
Install Sink
Install Light
Install Toilet
Install Shower
Install Towel Radiator
Install Mirror
Install UFH Thermostat
Install In-Line Extractor fan
7
Paint Ceiling
Seal Bath (2nd Seal)
Install accessories
Just want to see if I have ordered what needs to get done correctly
Thanks
Prep Block up small window
Prep Install Shut off valves for bathroom water supply
1 Gut bathroom
• Bath, Toilet & Sink
• Shower unit
• Radiator & Brackets
• Tiles
• Skirting
• Smooth down ceiling
• Febond Blue-Grit on ceiling
2
Wiring for Mirror
Install Light Switch
Wiring for Towel Radiator
Wiring UFH Thermostat
Replace Copper piping with Plastic pipes & chase into walls
3
Install new floorboards
Install 6mm Warmup boards
Skim ceiling
Plaster
4
Tank wet areas
SBR Primer on Walls
Lay down UFH
Level floor
5
Fit Bath (1st Seal)
Tile Wall
Tile Floor
6
Plumb Bath
Install Sink
Install Light
Install Toilet
Install Shower
Install Towel Radiator
Install Mirror
Install UFH Thermostat
Install In-Line Extractor fan
7
Paint Ceiling
Seal Bath (2nd Seal)
Install accessories