We are currently in process of renovating house and will be doingthe bathroom to, ripping it out and getting it replastered, my question is...
which way round do we do things as we are going to need to plumbing done for a shower. the pipes are going to need to be hidden, its one of those that u run straight of the boiler(combi). Do we have the plumbing done before hand or just chase out the plaster etc for the pipes, this is one part that confuses me..Or do we create a fake wall where the pipe is going to run for the shower.
which way round do we do things as we are going to need to plumbing done for a shower. the pipes are going to need to be hidden, its one of those that u run straight of the boiler(combi). Do we have the plumbing done before hand or just chase out the plaster etc for the pipes, this is one part that confuses me..Or do we create a fake wall where the pipe is going to run for the shower.