Just dug out concrete in an area of 17ft x 14ft . Ready for lawn area .
Had some soil from another part of garden and have put this in hole where concrete was !
All a bit up and down in gap ect , but my problem is I need to build up area 5inch higher
So far I thought TOPSOIL ! but for a hole this size the cost is £250 ( cheapest so far locally, just for some topsoil
Any ideas the best way to build up level and process to achieve my lawn ?
Will get topsoil if no better ideas !
Had some soil from another part of garden and have put this in hole where concrete was !
All a bit up and down in gap ect , but my problem is I need to build up area 5inch higher
So far I thought TOPSOIL ! but for a hole this size the cost is £250 ( cheapest so far locally, just for some topsoil
Any ideas the best way to build up level and process to achieve my lawn ?
Will get topsoil if no better ideas !