My extension was supposedly out of level. 50mm over 7m so when the floor was screeding level it falls 30mm below the finished brick opening internally. Outside is 4 courses down as I need to build it up. What are my threshold options. The screed was meant to go to brick level but screeder reckons it would have noticed too much. Will this be an issue? This 30mm internal drop