Hi
I'm currently build a wall between a house and garage (tied in with wall ties)
It's a cavity wall but I need to build it fairly quick as I need to get a flat roof on before it gets too cold.
If I was to just build the inner block work (7.2n fibolites) would this be strong enough temporarily or a no go due to wind etc.
Wall is 2.5m wide and 2.5 high and tied in both sides
Thanks for any help