Hi,
I am going to be bricking up a serving hatch and a hole that held a gas fire, both approx 900mm x 600mm on the same single brick, loading bearing, internal wall.
Do I need to tie into the existing brickwork with ties or a wall starters? If so, which is best and should I put them every other course?
Any thoughts would be much appreciated.
I am going to be bricking up a serving hatch and a hole that held a gas fire, both approx 900mm x 600mm on the same single brick, loading bearing, internal wall.
Do I need to tie into the existing brickwork with ties or a wall starters? If so, which is best and should I put them every other course?
Any thoughts would be much appreciated.