Hi,
I'm going to be building a step from brick ands paving slabs to go outside
the door of my new kitchen.
The problem is that the DPC will be far less than 150mm from the top to the
step, it might be as little as 50mm.
So I think all I can do is have a gap (i'm thinking about 15mm) at the back between the step and the house.
Is this what is normally done ? Or is the some other solution that I have missed?
Many thanks in Advance
Steve.
I'm going to be building a step from brick ands paving slabs to go outside
the door of my new kitchen.
The problem is that the DPC will be far less than 150mm from the top to the
step, it might be as little as 50mm.
So I think all I can do is have a gap (i'm thinking about 15mm) at the back between the step and the house.
Is this what is normally done ? Or is the some other solution that I have missed?
Many thanks in Advance
Steve.