butt joining floor slabs

Joined
26 Nov 2008
Messages
239
Reaction score
37
Location
Coventry
Country
United Kingdom
I have to butt join a new floor slab to an existing one. Both slabs on 75mm celotex insulation. Both slabs to be covered in 75mm screed and tiled. What is the best way of ensuring the join does not crack or spread in the future ?
Thanks,
Simon.
 
Sponsored Links
If you have the same sub-soil, the same compacted sub base and the same conditions overall then there is little else you can do.

If you happen to get any heave or differential movement between slabs then you are not going to be able to do much about it.

I guess if you were to fit some light mesh in the screed, any diff' related cracking could be avoided, mebbe?

I personally would just screed the floor and take my chances.

Are you on clay?
 
If you have the same sub-soil, the same compacted sub base and the same conditions overall then there is little else you can do.

If you happen to get any heave or differential movement between slabs then you are not going to be able to do much about it.

I guess if you were to fit some light mesh in the screed, any diff' related cracking could be avoided, mebbe?

I personally would just screed the floor and take my chances.

Are you on clay?

It is basically clay underneath, but not that subject to heave I believe. The BCO did not require any compressible material around the foundations for example.
Simon.
 
Sponsored Links
You could drill a few dowels into the existing slab to provide a little continuity.. but as said if something does move then it will only crack elsewhere.. just make sure the sub base is well compacted
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top