I have to butt join a new floor slab to an existing one. Both slabs on 75mm celotex insulation. Both slabs to be covered in 75mm screed and tiled. What is the best way of ensuring the join does not crack or spread in the future ?
Thanks,
Simon.
Thanks,
Simon.