- Joined
- 20 Mar 2017
- Messages
- 2
- Reaction score
- 0
- Country
His
I want to batten on an existing ceiling and run cable for lighting in the void created before putting up new plasterboard. I am intending to use 25mm battens.
Are there any regs to stop me doing this if I protect the cable or do I need to put cable in conduit?
I want to batten on an existing ceiling and run cable for lighting in the void created before putting up new plasterboard. I am intending to use 25mm battens.
Are there any regs to stop me doing this if I protect the cable or do I need to put cable in conduit?