I have a bathroom which sits in the middle of the house. It did not have a toilet but I want to add one during a refurb.
To get to the existing soil stack I woul need to pass the waste pipe under floor boards between joists for about 2 metres. Then I would need to turn thru 90 degreed to hit the stack which is about 3 metres away. Is it aceptable or wise to adopt this L shaped pipe layout with a rodding point on the bend.
I can get the falls ok across the pipe length.
Or should i buy a macerator and stay off the ale for a couple of weeks in order to pay for it.
Any thoughts?[/img]
To get to the existing soil stack I woul need to pass the waste pipe under floor boards between joists for about 2 metres. Then I would need to turn thru 90 degreed to hit the stack which is about 3 metres away. Is it aceptable or wise to adopt this L shaped pipe layout with a rodding point on the bend.