A friend is doing up an old railway ticket office that used to be fed off a local level crossing supply. This was for just 2 lights & 1 double power point. They now want a 40amp supply & asked to local lecy board for a new main & was quoted quite a few thousand pounds because it needs a transformer.
Now! the ticket office is next to a small industrial unit that has a work shop with a 100amp 3 phase supply only 20 met away & the owner said they can take a feed from his unit as long as its metered. "Via a 60amp personal single phase meter" Question is:
Can a cable be run from a 60amp switch fuse underground into the ticket office then into a 4 way rcd board. The reason we ask is the workshop it would come from is some times closed & we wouldn't have access to the rcd if it tripped. Is it ok to run the SWA cable underground with a switch fuse & no rcd then have the rcd in the ticket office. This is all to do with preserving a railway ticket office.
Now! the ticket office is next to a small industrial unit that has a work shop with a 100amp 3 phase supply only 20 met away & the owner said they can take a feed from his unit as long as its metered. "Via a 60amp personal single phase meter" Question is:
Can a cable be run from a 60amp switch fuse underground into the ticket office then into a 4 way rcd board. The reason we ask is the workshop it would come from is some times closed & we wouldn't have access to the rcd if it tripped. Is it ok to run the SWA cable underground with a switch fuse & no rcd then have the rcd in the ticket office. This is all to do with preserving a railway ticket office.

