Hello
Can anyone help?
We need to remove 3 radiators to accomodate some building work. We are ok with removing the radiators but we want to cap the pipes below the floorboards. Can anyone advise how we do this, the pipework is 8 or 10mm microbore copper. I am worried that if i cut the pipe to put a compression end cap or solder a cap on, the water will flow out of the pipes when it is cut. Also do the 2 pipes need to joined to keep the system flowing to other radiators
thank you
Can anyone help?
We need to remove 3 radiators to accomodate some building work. We are ok with removing the radiators but we want to cap the pipes below the floorboards. Can anyone advise how we do this, the pipework is 8 or 10mm microbore copper. I am worried that if i cut the pipe to put a compression end cap or solder a cap on, the water will flow out of the pipes when it is cut. Also do the 2 pipes need to joined to keep the system flowing to other radiators
thank you