We have just had a vestibule built on the front of our house and the final flooring level was done with a concrete self leveling floor compound around 7-8 weeks ago.
It seems to have completely dried out now and I am wondering what the recommended next steps are as I would like to use underlay and then a wool carpet.
Do i need to seal or treat the concrete in anyway before I lay the underlay ?
EDIT: Also - Does anyone have any tips for fixing gripper rods down on concrete floor ? - I was just going to use "no more nails"
It seems to have completely dried out now and I am wondering what the recommended next steps are as I would like to use underlay and then a wool carpet.
Do i need to seal or treat the concrete in anyway before I lay the underlay ?
EDIT: Also - Does anyone have any tips for fixing gripper rods down on concrete floor ? - I was just going to use "no more nails"