- Joined
- 31 Aug 2013
- Messages
- 261
- Reaction score
- 1
- Country
To do both walls of the basement it took me about 2 days, but that was being lazy, I could have done it in a day to be honest.
The drill you've got should be fine. SDS is basically the design of the drill and bits that fit to it.
This is the sort of thing you're after http://www.screwfix.com/p/flat-breaker-chisel-18in/21178?_requestid=215747
Make sure drill is set on hammer and not drill and you should make light work of the rest of it.
I'll post a picture of my trickle vents soon (which still haven't gone in !)
The drill you've got should be fine. SDS is basically the design of the drill and bits that fit to it.
This is the sort of thing you're after http://www.screwfix.com/p/flat-breaker-chisel-18in/21178?_requestid=215747
Make sure drill is set on hammer and not drill and you should make light work of the rest of it.
I'll post a picture of my trickle vents soon (which still haven't gone in !)