Changes to internal soil stack

Joined
28 Feb 2010
Messages
16
Reaction score
2
Location
Derbyshire
Country
United Kingdom
Hi

I'm hoping someone can confirm that the changes I'm planning to make to my internal soil stack meet regulations.

The existing stack has an offset in the floor void of the 1st floor of my property. The upper section leads up to an AAV in the loft. There is a toilet connected to one of the branches at the offset.

I'm wanting to move the existing toilet connection so that it flows into the top of the lower part of the soil stack. Is this allowed?


The top of this lower section of the stack is capped by a (Terrain) solvent weld end cap. As I'm expecting not to be able to remove this cap, I'm planning on cutting away the very end of the cap itself, leaving the collar inside the top of the stack. Can I then use something like a McAlpine push fit connector to connect the pipe from the toilet to the stack?
https://www.screwfix.com/p/mcalpine-push-fit-single-socket-drain-connector-black-110mm/4255V?tc=KC2

Is there a better way of doing it?

Thanks for any suggestions.
 

Attachments

  • soil stack existing.JPG
    soil stack existing.JPG
    18.2 KB · Views: 60
  • soil stack proposed.JPG
    soil stack proposed.JPG
    18 KB · Views: 55
Sponsored Links
Cut the cap off completely, providing you have enough pipe left, then just put a standard coupler on it, and go from there.
 
Sadly not. The cap is fitted directly into the top of the branch section so I think cutting the cap is my only option.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top