Hi,
I’m going to lay some concrete edging (915mm x 150mm x50mm ) in the next few days. I’ve seen a few videos where the concrete is quite dry under the concrete edging blocks and then wetter for the haunching. Is this what I should be aiming for?
Many thanks,
Ed
I’m going to lay some concrete edging (915mm x 150mm x50mm ) in the next few days. I’ve seen a few videos where the concrete is quite dry under the concrete edging blocks and then wetter for the haunching. Is this what I should be aiming for?
Many thanks,
Ed
Last edited: