Hi all
Those who read the shocking experience will understand that the spark employed to wire the house wasn't the brightest.
Anyway he has left me with a real conundrum.
I have hall lighting on one ring controlling 12 mains voltage downlighters. the lights are switched from 3 switches. no probs so far you may think.
However the switch cable from junction runs from to the middle switch and then 4 core from their to the back door and then another to the front door. Clearly this makes it difficult to run the standard 2 way - int - 2way configuration.
Given that the spark is now released from duty is there anyway to complete this switching??
thanks
Those who read the shocking experience will understand that the spark employed to wire the house wasn't the brightest.
Anyway he has left me with a real conundrum.
I have hall lighting on one ring controlling 12 mains voltage downlighters. the lights are switched from 3 switches. no probs so far you may think.
However the switch cable from junction runs from to the middle switch and then 4 core from their to the back door and then another to the front door. Clearly this makes it difficult to run the standard 2 way - int - 2way configuration.
Given that the spark is now released from duty is there anyway to complete this switching??
thanks