- Joined
- 13 Jan 2016
- Messages
- 253
- Reaction score
- 2
- Country
At first fix stage, how do we turn on the towel rads in the Spring/Summer but without having the entire CH on?
System will be indirect pressurised cylinder with system boiler.
Have read about 'dual' rads which switch to electric..are there any other options??
System will be indirect pressurised cylinder with system boiler.
Have read about 'dual' rads which switch to electric..are there any other options??