Hi, I wondered if anyone could provide some guidance please.
I am renovating our main bathroom and I am looking to add a mixer bar shower over the bath. A plumber has indicated taking the feeds from the bath taps would be fine, it's on a combi boiler and pressure is good.
What would be the correct or best way to to do this?
Compression T piece into plastic pipe up to shower height then copper pipe to attach shower?
Or should be soldered copper pipe all the way up?
I am renovating our main bathroom and I am looking to add a mixer bar shower over the bath. A plumber has indicated taking the feeds from the bath taps would be fine, it's on a combi boiler and pressure is good.
What would be the correct or best way to to do this?
Compression T piece into plastic pipe up to shower height then copper pipe to attach shower?
Or should be soldered copper pipe all the way up?
