- Joined
- 9 Feb 2005
- Messages
- 299
- Reaction score
- 5
- Country

Hi,
I have just had 18m of 127mm cove delivered and a bag of adhesive. It is gyprock and the adhesive is a 5kg bag.
It doesnt look much and i cant find out how far the 5kg should go. It doesnt say on the bag and the gyprock site is down.
Does anyone know if 5kg is enough (i dont like starting jobs i cant finish)
Thanks!
I have just had 18m of 127mm cove delivered and a bag of adhesive. It is gyprock and the adhesive is a 5kg bag.
It doesnt look much and i cant find out how far the 5kg should go. It doesnt say on the bag and the gyprock site is down.
Does anyone know if 5kg is enough (i dont like starting jobs i cant finish)
Thanks!