Anyone put me right please, I have taken up our old patio slabs, well past there sell by date. Problem is I checked the distance from the damp course to the top of the old slabs 3 to 4 inch's, everywhere say's it should be 150mm, near to 6 inch's. I cant break up and dig out the old concreate base, but I've read and been told this can be a smaller gap if I start the slabs out from the wall and fill in with gravel or slate. Any idea's please. Reg
