About to pour foundation footings, and would like to install a duct for the mains cable for a meter move at a later date.
Spoke to my supplier (Scottish Power) who said they would do a resin joint outside my property and pull in the longer cable to the new location.
In my haste I forgot to ask how deep the duct entry needed to be below finished ground level, any ideas anyone?
Thank you.