Hi
I am making mods to my property, which are pretty extensive and need to comply to Part P. Where possible I am doing all the work myself. This makes it very slow and it will be completed in parts. We are still living in it.
Does anyone have any suggestions how I can make sure that I do not have problems with sign off for hidden cabling / wiring. If I have to call in someone qualified to certify every time, to see a socket here, a socket there will be 10 plus visits over 2 years or so.
Are photographs accepted.
I am making mods to my property, which are pretty extensive and need to comply to Part P. Where possible I am doing all the work myself. This makes it very slow and it will be completed in parts. We are still living in it.
Does anyone have any suggestions how I can make sure that I do not have problems with sign off for hidden cabling / wiring. If I have to call in someone qualified to certify every time, to see a socket here, a socket there will be 10 plus visits over 2 years or so.
Are photographs accepted.
