Dormer Loft Conversion - Fire Regs

Joined
20 Nov 2026
Messages
1
Reaction score
0
Country
United Kingdom
Guys

Question, im getting very confused. We have a semi-detached with a dormer being built. My question is about fire regs. Does the dormer need to have 30 mins or 60mins fire rating? I'm referring to the cheek closest to the neighbour's roof. It will be about 500mm from their roof boundary

Im my mind it has to be 30mins at least, but is this done with 18mm Ply\Cement board? or do tiles count as the fire rating externally? The intention is probably to clad it, but I see the options are limited. Everything I read is confusing, as places say tiles dont count as they could crack or dislodge in a fire, or flames\heat could pass through the tile spacing.

Help ? Thanks
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top