anyone help? i am fitting six 240v downlights and need some help with the wiring. my ceiling had to come down so i was able to get the wiring ready. what i did was (hope its right cos the ceilings back up now) ran a 1.5mm cable from existing lighting junctin box to first hole the to next and so on till the sixth hole and then to switch. is this right?
or should it be from juction to switch and then junction to lights
please help before i put the lights in
please help before i put the lights in
