Hi All,

I'm replacing the concrete slab floor in my downstairs cloakroom as its foundation is settling causing the slab to drop; about 40mm so far and still moving. I've removed the old slab, replaced its foundation with well compacted rubble and I'm almost ready to pour the new slab.

The top of the new slab will be about 100mm lower than DPC (the original FFL) and will have a timber floor on top, bringing the FFL back up to DPC level. This means 100mm of the block work below DPC will be exposed above the top of the new slab. Hope that all makes sense?

Can anyone tell me if it is necessary (or a good idea) to seal the new DPM to the newly exposed block work below the DPC, if so, how is this best done?

Regards.
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top