As part of my increasing jobs, I need to cut some pipes to below floor level and cap them. Capping no problem, going the blowtorch way (fire, we like fire)
I've stopped the mains, emptied the systems before, that's fine, it's just dealing with physical below floor horizontal pipework I'm not sure how to catch the unknown quantity of water (22mm pipe coming from bathroom to en suite by the looks of it).
I can't get a bucket under there, got roughly 10cm space to play with
I've stopped the mains, emptied the systems before, that's fine, it's just dealing with physical below floor horizontal pipework I'm not sure how to catch the unknown quantity of water (22mm pipe coming from bathroom to en suite by the looks of it).
I can't get a bucket under there, got roughly 10cm space to play with