Anyone know how long it might take for my 150mm thick and 2.5m by 4.8 m floor slab will take to dry sufficiently for me to lay my laminate?

I will be laying it on a 3mm foam type of underlay although this isn't a dpm, as I already have that in the floor construction.

Should i still lay another dpm on top of the slab before the laminate or just go with the 3mm foam underlay??
 
Sponsored Links
Rule of thumb (in normal circumstances) 1 inch of concrete/screed takes 30 days to dry.
On any concrete/screed floor, regardless of DPM underneath the concrete, you do need a DPM in the underlayment to prevent any residue moist from the screed getting into the wooden floor.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top